The ability to convert a production run in mid-run would be convenient. If I accidentally set a 9 hour when I meant to click 3 and now 5 hours have gone by. Or I meant to do a 9 hour run, and realize after two hours that I set 3. A button with the ability to modify the run (loosing any extra if there is any) would occasionally save me feeling like I'e wasted a bunch of time as I cancel a run to replace it with a shorter one.
 

DeletedUser9340

Guest
(wishful thinking, I know)

The ability to convert a production run in mid-run would be convenient. If I accidentally set a 9 hour when I meant to click 3 and now 5 hours have gone by. Or I meant to do a 9 hour run, and realize after two hours that I set 3. A button with the ability to modify the run (loosing any extra if there is any) would occasionally save me feeling like I'e wasted a bunch of time as I cancel a run to replace it with a shorter one.

That would be wishful thinking indeed but might work with a bit of a twist...such as...
Freeze
Switch to
Apply
But to make it real as well, take into account the time it would switch production and continue run minus the difference.
Would mean a new algorithm and then tally in the cost as it would have to reflect the downtime. So actually it would be like taking the difference and the add 2hrs to the switched to time and something like 250 coins.
 

DeletedUser8946

Guest
@Ashrem Wishful thinking, probably. But I think @BluebellHard1 has got a point. They might have it if they had an algorithm. So you couldn't switch a Basket of Groceries to Advanced Tools 3 hours into the production, but maybe 4 and a half hours in.
 